OPM Retirement Backlog & Processing Times: The Monthly Record

OPM publishes its retirement-processing report once a month, then replaces the file. The history disappears. We archive every report and keep the record: 47 straight months and counting, October 2022 to August 2026.

As of OPM’s August 2026 report, the federal retirement backlog stands at 15,427 cases (down from the February 2026 peak of 65,237), while average processing time is 79 days: 70 for digital cases, 150 for paper.

OPM data through August 2026 · Page updated September 10, 2026 · Next OPM report expected early October 2026

Backlog Watch

OPM posts this number once a month, then replaces the file. We log the new one the day it lands. And while you wait, there’s the OPM phone line, decoded from real calls: how to get past the busy message, what to say to reach a person, and the callback that holds your place. Both are free.

You get the decoder now, then one email a month with OPM’s new backlog number, plus a short note when a new free tool ships. No spam, no selling your address. Unsubscribe anytime.

Can’t get through to OPM? The phone line, decoded, free. →

Backlog: 15,427 cases (end of August 2026), the lowest since December 2024, about 1.2× OPM’s published 13,000-case steady-state goal.

Average processing: 79 days (August 2026), the first fall since March, still above the pre-surge typical of about 65.

Digital 70 days vs paper 150 days (August 2026), an 80-day gap, the widest OPM has published.

The peak: 65,237 cases, February 2026. That was the surge’s high-water mark, and the number still quoted long after it stopped being true.

The story the series tells

Three years of OPM’s own numbers tell one clean story. Through 2023 and 2024 the system was getting healthier: inventory ground down from 25,227 toward OPM’s 13,000-case goal, and processing ran in the 47–65-day band.

Then the surge: from January 2025, the deferred-resignation wave and the September 30, 2025 retirement class more than quadrupled the queue, to a peak of 65,237 in February 2026.

Since March 2026 the drain has been real. Record throughput months pulled inventory down to 15,427 by August, the lowest since December 2024 and back inside the range the system ran in before the surge.

The counter-trend is the part the headline hid all spring: while the count fell, the average wait rose, 60 days in March to 109 by July. Fast, digital, straightforward cases clear first; older, paper, complex cases finish last, and they set the average. August is the first month since March that both fell, to 15,427 cases and 79 days. The split is why: digital cases dropped to 70 days while paper barely moved, 156 to 150. That gap, between the published number and the felt wait, is the reason this page exists.

The backlog, month by month
020,00040,00060,0002023202420252026OPM’s steady-state goal (13,000)Feb 2026: 65,237Aug 2026: 15,427
Average processing days
040801201602023202420252026
All claimsDigital (published from Oct 2025)Paper (where OPM stated it)

Three common misreadings

Is the backlog still 65,000, or 70,000?

No. 65,237 was the February 2026 peak. As of OPM’s August 2026 report, the inventory is 15,427, about 76% below that peak. The bigger numbers keep circulating because OPM overwrites its report each month, so there is no official history to check a quote against. This page keeps that history.

OPM says 79 days. I’ve been waiting far longer. Which is wrong?

Probably neither. Three things make the published average a different measure than your wait. The clock starts when OPM receives your complete package, after the months your case spends at your agency and its payroll office. It averages the cases OPM finished last month, not the ones still waiting. And it blends digital cases (70 days in August) with paper ones (150 days). A paper case filed during the surge can sit far beyond the average while the average stays honest. OPM’s own caveat says the same: cases involving a court order, special computation, workers’ compensation, missing documentation, or a deferred or postponed application “may take longer to process.”

The backlog is shrinking. Why hasn’t my wait?

It depends on how you filed. In August, OPM processed 15,281 cases against 7,618 received, twice what came in, and for the first time since March the average fell with the count, to 79 days. Nearly all of that improvement is digital: 98 days in July to 70 in August. Paper went from 156 to 150. The cases clearing fastest are the digital, straightforward ones; what remains is older, more often paper, more often complex, and those files still set their own lane’s average. If you filed on paper, “the backlog is shrinking but my wait isn’t” is still an accurate description of August.

What these numbers measure, and what they don’t

Every figure on this page comes from one source: OPM’s Monthly Retirement Processing Status report, the PDF OPM publishes at opm.gov each month. Three things to know about what it measures:

  • The processing average is OPM’s clock only. It starts when OPM receives a complete package from the agency. The months a case spends at agency HR and payroll before that are not in it.
  • It is backward-looking.79 days” averages the cases OPM finished in August, not the cases still in the queue. In a surge, the slowest cases haven’t finished yet, so they aren’t in the average.
  • The digital/paper split only exists from October 2025. OPM began publishing it mid-transition; before that, one blended number was all there was.

OPM’s own methodology note, verbatim: “The processing times are averages, which means your application may take more or less time depending on your individual circumstances. For example, if your case involves a court order, special computation, workers’ compensation, missing documentation, or is a deferred or postponed application it may take longer to process.”

Fed Retirement Tools is independently built and is not affiliated with OPM.

The full monthly record, October 2022 to August 2026

OPM monthly retirement processing, October 2022August 2026. “n/a” = OPM did not publish that figure: the digital/paper split begins October 2025, and paper averages appear only where OPM stated them.
MonthBacklog (month-end)ReceivedProcessedAvg daysDigital daysPaper days
Aug 202615,4277,61815,2817970150
Jul 202624,78410,53817,84110998156
Jun 202633,8518,66312,75110896120
May 202638,54711,28619,4338766105
Apr 202649,88811,94017,1757850n/a
Mar 202655,68114,75922,237603979
Feb 202665,23731,24018,1497134n/a
Jan 202654,01818,92315,5717748n/a
Dec 202550,56613,1749,4286740n/a
Nov 202548,39623,3938,7076638n/a
Oct 202534,58720,3448,751794579
Sep 202523,5527,0957,90276n/an/a
Aug 202524,3599,41611,19570n/an/a
Jul 202526,1388,2958,48559n/an/a
Jun 202526,32813,4308,58545n/an/a
May 202521,48315,0489,73949n/an/a
Apr 202516,1738,3328,95349n/an/a
Mar 202516,7947,80311,55950n/an/a
Feb 202520,5509,63712,36444n/an/a
Jan 202523,27716,1016,70064n/an/a
Dec 202413,8765,0204,98857n/an/a
Nov 202413,8446,8087,87255n/an/a
Oct 202414,9086,8726,45862n/an/a
Sep 202414,4945,6186,30263n/an/a
Aug 202415,1787,0837,70264n/an/a
Jul 202415,7976,4515,99465n/an/a
Jun 202415,3406,9195,61464n/an/a
May 202414,0356,7518,79360n/an/a
Apr 202416,0776,9017,64761n/an/a
Mar 202416,8237,94310,71155n/an/a
Feb 202419,5918,79410,02547n/an/a
Jan 202420,82212,9976,46766n/an/a
Dec 202314,2925,6627,19668n/an/a
Nov 202315,8265,2076,05966n/an/a
Oct 202316,6786,9246,09873n/an/a
Sep 202315,8526,7688,87970n/an/a
Aug 202317,9637,3836,46774n/an/a
Jul 202317,0477,2616,58485n/an/a
Jun 202316,3704,8546,60974n/an/a
May 202318,1256,0968,35571n/an/a
Apr 202320,3848,29810,83970n/an/a
Mar 202322,9258,3548,92969n/an/a
Feb 202323,5009,56210,92065n/an/a
Jan 202324,85812,4049,14293n/an/a
Dec 202221,5965,4907,74385n/an/a
Nov 202223,8496,0647,44292n/an/a
Oct 202225,2276,4237,83889n/an/a

Download the series (CSV). Reuse is welcome with attribution to Fed Retirement Tools and a link to this page.

Where the numbers come from

OPM publishes the Monthly Retirement Processing Status as a single PDF and replaces it in place each month; no history page exists. We archive each report as it lands (and backfilled the record to October 2022 through the Internet Archive), then merge the overlapping monthly tables; where two captures overlap, the later publication wins. The compilation is ours; every number in it is OPM’s.

Source: OPM, Monthly Retirement Processing Status, opm.gov/retirement-center/retirement-statistics/. Series compiled and maintained by Fed Retirement Tools.

Where does your case sit against these numbers?

The free tracker reads your own dates against OPM’s published pipeline: where your package likely is, what each stage means, what to do next. No account.

Deeper in the wait? The $19 Limbo Kit is twelve tools for exactly this stretch.